Map of N.G. transmission system

The Infrastructure of natural gas Transmission System

 Moldovatransgaz LLC (01.01.2021)

No.
Index
Value
Project capacity

Main pipelines – total:

656,307 kм

-

 
 Ananiev-Tiraspol-Ismail (ATI)  DN 1200, PN 7,5MPa

62,91 km

20 billion  m3/year
 
  Razdelinaia-Ismail  (RI)
DN 800, PN 5,5MPa

92,24 km

7,3 billion m3 /year
 
  Șebelinca-Dnepropetrovsk-Krivoi Rog-Ismail (ȘDKRI)
DN 800, PN 5,5MPa

91,817 km

7,3 billion m3 /year
 
  Ananiev-Cernăuți-Bogorodcianî (АCB) DN 1000, P 5,5MPa

184,8 km

9,1 billion m3/year
 
 Chișinău-Râbnița (ChR)
DN 500, PN 5,5MPa

91,1 km

1,5 billion m3/year
 
  Odesa-Chișinău (ОCh)
DN 500, PN 5,5MPa

44,0 km

1,3 billion m3/year
 
  Tocuz-Câinari-Mereni (ТCM) DN 500, PN 5,5MPa

62,74 km

1,8 billion m3/year
 
  Olișcani-Saharna (ОlS)
DN 500, PN 5,5MPa

26,7 km

            -
II
Branch pipelines - total:
          903,478 kм
 
III
Gas compression stations
 
 
 
CS Drochia
5 GPA-Ț-6,3
Aviation engine  
НК-12ST
Summary power
31,5 МW
 
CS Vulcănești
5 GPA-STD–4000
Electric engine
STD–4000
Summary power
20,0 МW
 
CS Șoldănești
6 GPA-STD–4000-2
Electric engine STD–4000-2
Summary power
24,0 МW
IV
Căușeni gas measurement station

1 station 

32 billion. m3/year
V
Stations of Regulation Measurement and Delivery of gas  

81 stations

               
VI
Station of cathodic protection

221 stations 

 
VII
Lines of cables for technological telecommunications

1 914,94 km